Case Studies in Engineering Excellence
Share |


Flood Protection




Freese and Nichols: Upper Brushy Creek Dam 7 Modernization Project for the Upper Brushy Creek Water Control & Improvement District

 

This 50-year-old flood control dam near Austin was reclassified by the state to “high hazard” due to substantial development downstream. Upper Brushy Creek WCID undertook a comprehensive upgrade of the dam to meet current safety requirements and provide increased flood protection to downstream residents. Freese and Nichols designed modifications to the dam and utilized a unique labyrinth weir due to its ability to maximize spillway discharge within a limited footprint. The site-specific spillway design required extensive hydraulic modeling. The design also included upgrades to the beloved hike-and-bike trail across the dam which offers a scenic recreational amenity for the community.

 

 

Community Search
Sign In


Calendar

10/22/2019
ACEC San Antonio Chapter Meeting - 10/22/19

10/23/2019 » 10/24/2019
2019 Texas M&A Symposium

10/23/2019
ACEC Tarrant October Luncheon with Russell Laughlin - Hillwood